B-BBEE Certificate: Level 1 Contributor  |  +27 11 655 7197  |  sales@enviroblue.co.za

B-BBEE Certificate: Level 1 Contributor
+27 11 655 7197  |  sales@enviroblue.co.za

COPPER MINE – DRC Phase 4

Is an open-pit copper cobalt mine in the Katanga Province of the Democratic Republic of Congo. After completion of phase 2 and 3, our software engineers secured the sub-contract in 2011 to continue with Phase 4 expansion control system and to provide Siemens PCS7 v7.4 engineering services using existing standards from Phase 2/3 implementation. The system comprised of the various stations as per the system architecture below and consisted of 1800 remote I/Os, 700 devices (VSDs and simocodes) and various vendor system interfaces on profibus. This project was successfully completed in 2013 over a period of two (2) years.

 

System Architecture:

 

 

Scope of Engineering Services:

 

  • Installation and configuration of all AS and OS stations.
  • Setup and configuration of a granular type multi-project environment.
  • PLC and Scada software development as defined by the Process functional specifications.
  • Factory acceptance testing of the various OS/AS stations, MCCs and software.
  • Provide excel worksheets derived from Process Object View to allow quick and easy software implementation of signals from remote IO stations into their respective PLCs.
  • Audit and certify profibus networks.
  • Assisted with Siemens MM440 VSD parameterization.
  • Assisted with Simocode Pro v setup and configurations.
  • Commissioning assistance when required.
  • Provide remote system support services.

For all your Industrial Solutions.

We value excellence and offer accurate service and top-class engineers.

Address 

Birchwood Court, 43 Montrose Street Vorna Valley, Midrand, 1686

Telephone

+27 11 655 7197

 

Email

sales@enviroblue.co.za

 

Office Hours 

Mon-Fri: 9am to 5pm